If you want to have your bathroom renovated, you should think carefully in advance about what type of bathroom renovation is suitable for you and how long it will take.
Only in this way can you ensure that the work will be completed within the desired time frame.
If you want to have your bathroom renovated, you should think carefully in advance about what type of bathroom renovation is suitable for you and how long it will take.
Only in this way can you ensure that the work will be completed within the desired time frame.
Bathroom is one of the most important rooms in every home. That is why it is especially important to know how long you can not use it during a bathroom renovation.
As a rule, a complete bathroom renovation takes between two and four weeks. However, the exact duration of a bathroom renovation depends on many factors. For example, depending on the extent of the renovation work, it can take different amounts of time to finish everything. The way in which the bathroom is renovated also has a major impact on the duration of the renovation.
Impact damage, cracks and scratches in bathtubs and shower trays are repaired within a few hours with the highest quality standards.
Impact damage, cracks and scratches in bathtubs and shower trays are repaired within a few hours with the highest quality standards.
Scratched, dull, matte plastic bathtubs are restored to their original shine with polish and polishing machine.
Bathtubs and shower trays are completely coated with our SANCOAT sanitary varnish – this creates a high-quality, new surface.
By adding GRIPTEX to our sanitary varnish, we achieve a slip-resistant surface after application (slip resistance class R13). Can be applied to all sanitary surfaces afterwards.
Joints are repaired and damages in the tiles are filled, then the tiles are coated with our sanitary varnish SANCOAT. The tile and grout pattern is preserved. Not suitable for floor tiles.
For wall coating we work with special materials suitable for wet areas. An adhesive primer is applied to the old tiles, then the tiles are trowelled in 2-3 passes (including reinforcement).
After that, the tiles are painted and sealed. Between each step of the work, there are always longer drying times, which should be cleverly used, either by doing other work or by scheduling the work so that the drying times are overnight.
In the case of design flooring, the tiles are first leveled with a leveling compound to create a smooth surface, then the design flooring is glued to the leveled floor and silicone grout is installed.
Dirty or damaged tile joints and silicone joints are renewed with special bazuba procedures.
Dirty or damaged tile joints and silicone joints are renewed with special bazuba procedures.
A door (naturally tight) is installed in existing tubs. This facilitates access for the elderly and/or infirm. The doors are always custom-made, as they have to be adapted to the customer’s circumstances.
A hole is cut in the tub and tub support, which is then carefully filled and the door is glued to the resulting surfaces with an adhesive and sealant without gaps. Finally, a silicone joint is laid.
Expertly installed furniture, ceramics, faucets, shower partitions, mirror cabinets, mirrors, accessories, radiators, etc.
Partial renovation – the bathtub is dismantled by the plumber and a new shower tray is placed. If the size of the new shower does not coincide with the former bathtub, floor renovation is necessary (design flooring or stone carpet) – bathtub-sized shower trays are now available from various manufacturers. The walls of the new shower area are covered with panels.
Complete bathroom renovation without tearing out the tub, without knocking off the tiles and without days of construction site. The tiles, bathtub and/or shower tray are coated with high-quality sanitary varnish, the floor is renovated with natural stone pebbles or design flooring. Faucets and bathroom furniture are replaced upon request. Thus, the customer receives a bathroom as good as new in a short time.
Complete bathroom renovation without tearing out the tub, without knocking off the tiles and without days of construction site. The tiles are filled, the bathtub and/or shower tray is coated with high-quality sanitary varnish, the floor is renovated with natural stone pebbles or design flooring. Faucets and bathroom furniture are replaced upon request. The seamless wall coating is ideal for replacing and renewing bathtubs and shower trays or other remodeling work, as missing tiles are simply filled in with the filler.
If the bathroom was not tiled up to the ceiling (room-high), missing tiles can be replaced with construction panels. This way you get a continuous level and you can fill the wall up to the ceiling.
Impact damage, cracks and scratches in bathtubs and shower trays are repaired within a few hours with the highest quality standards.
Impact damage, cracks and scratches in bathtubs and shower trays are repaired within a few hours with the highest quality standards.
Scratched, dull, matte plastic bathtubs are restored to their original shine with polish and polishing machine.
Bathtubs and shower trays are completely coated with our SANCOAT sanitary varnish – this creates a high-quality, new surface.
By adding GRIPTEX to our sanitary varnish, we achieve a slip-resistant surface after application (slip resistance class R13). Can be applied to all sanitary surfaces afterwards.
Joints are repaired and damages in the tiles are filled, then the tiles are coated with our sanitary varnish SANCOAT. The tile and grout pattern is preserved. Not suitable for floor tiles.
For wall coating we work with special materials suitable for wet areas. An adhesive primer is applied to the old tiles, then the tiles are trowelled in 2-3 passes (including reinforcement).
After that, the tiles are painted and sealed. Between each step of the work, there are always longer drying times, which should be cleverly used, either by doing other work or by scheduling the work so that the drying times are overnight.
In the case of design flooring, the tiles are first leveled with a leveling compound to create a smooth surface, then the design flooring is glued to the leveled floor and silicone grout is installed.
Dirty or damaged tile joints and silicone joints are renewed with special bazuba procedures.
A door (naturally tight) is installed in existing tubs. This facilitates access for the elderly and/or infirm. The doors are always custom-made, as they have to be adapted to the customer’s circumstances.
A hole is cut in the tub and tub support, which is then carefully filled and the door is glued to the resulting surfaces with an adhesive and sealant without gaps. Finally, a silicone joint is laid.
Expertly installed furniture, ceramics, faucets, shower partitions, mirror cabinets, mirrors, accessories, radiators, etc.
Partial renovation – the bathtub is dismantled by the plumber and a new shower tray is placed. If the size of the new shower does not coincide with the former bathtub, floor renovation is necessary (design flooring or stone carpet) – bathtub-sized shower trays are now available from various manufacturers. The walls of the new shower area are covered with panels.
Complete bathroom renovation without tearing out the tub, without knocking off the tiles and without days of construction site. The tiles, bathtub and/or shower tray are coated with high-quality sanitary varnish, the floor is renovated with natural stone pebbles or design flooring. Faucets and bathroom furniture are replaced upon request. Thus, the customer receives a bathroom as good as new in a short time.
Complete bathroom renovation without tearing out the tub, without knocking off the tiles and without days of construction site. The tiles are filled, the bathtub and/or shower tray is coated with high-quality sanitary varnish, the floor is renovated with natural stone pebbles or design flooring. Faucets and bathroom furniture are replaced upon request. The seamless wall coating is ideal for replacing and renewing bathtubs and shower trays or other remodeling work, as missing tiles are simply filled in with the filler.
If the bathroom was not tiled up to the ceiling (room-high), missing tiles can be replaced with construction panels. This way you get a continuous level and you can fill the wall up to the ceiling.
If you decide to renovate the bathroom, you should keep in mind that this is a large and costly project. It is important to get well informed and carefully consider whether you can do the renovation yourself or if you want to get help from a professional. In any case, the renovation will completely change your bathroom and give you a lot of pleasure.
We have the tips so that you can make your bathroom shine in full beauty.